Back to Home
Back to Member Layout Index

Page Updated 05/16/2023      



Member Layout
Dean Ferris' Oregon Joint Line Railroad - NP/GN
N Scale

The Oregon Joint Line is a joint NP/GN mainline through the mountains and canyons of eastern Oregon connecting the Pacific Northwest with California. The layout, which is set in 1969 just prior to the BN merger, has plenty of pool power from the connecting California roads (WP, SP, and ATSF). Most heavy trains (freights are typically 22-28 cars long) receive helpers for the shove up the 2.2% grade to the summit at Snowline. A forest products shortline, the "Oregon & Northeastern", switches the Hines Lumber pulp/plywood complex and makes log runs out to Canyon Reload. The major terminal area has three yards (NP, GN, and the O&NE) with plenty of transfer/interchange activity and industrial switching.

Dean's layout is 25' x 28'. His car forwarding method is "Tab on Car." Operating sessions require: Dispatcher, 2 NP Yard crews, 1 GN Yard crew, 1 O&NE crew, 1 local/helper crew, 3 road crews. The layout is operated with radio controlled NCE DCC. Car forwarding is currently done with car tabs and dispatching is Track Warrants.





















Back to Home
Back to Member Layout Index